Closed 19 Oct 2026 Expression of Interest
Pre-feasibility Study for Inland Water Transport of Transit Containers, Bulk Fuel and ancillary cargoes - Mpakadan, Asikuma, Buipe and Yapei Ports
About this tender
GHANA INFRASTRUCTURE INVESTMENT FUND
REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES - FIRM SELECTION)
PRE-FEASIBILITY STUDY FOR INLAND WATER TRANSPORT DEVELOPMENT: MPAKADAN, ASIKUMA, BUIPE & YAPEI PORTS
BACKGROUND
The Ghana Infrastructure Investment Fund (“the Fund” or “GIIF”) is a body corporate wholly owned by the Republic of Ghana and established pursuant to the Ghana Infrastructure Investment Fund Act, 2014 (Act 877). The Fund’s mandate is to mobilise, manage, coordinate, and provide financial resources for investment in a diversified portfolio of infrastructure projects in Ghana for national development.
The 24-Hour Economy Authority (“the Authority” or “24H+”) is a body corporate established under the 24-Hour Economy Authority Act, 2026 (Act 1164) to implement the 24-Hour Economy and Accelerated Export Development Programme. The Authority’s objective is to ensure the integrated, sustainable transformation of national systems to maximise economic production, the supply chain, marketing, and labour development. To achieve this objective, the Authority is mandated, in collaboration with relevant agencies, to support the designation and development of strategic economic corridors for the rapid, synergistic expansion of various forms of production. GIIF, as the infrastructure financing partner for the Programme, and the Authority are jointly undertaking this Request for Expressions of Interest.
Ghana’s Volta Lake, spanning approximately 8,502 square kilometers and extending over 400 kilometers from the Akosombo Dam in the south to the country’s northern reaches, is one of the world’s largest man-made lakes and a significant yet underutilized inland waterway corridor. The lake passes through or near significant ports, offering the potential to serve as a cost-effective, low-emissions alternative to road transport for moving freight and passengers between northern and southern Ghana.
Mpakadan, situated in the Eastern Region near the Afram Plains, and Buipe, located in the Savannah Region on the Black Volta arm of the Volta Lake, are two strategic nodes along this corridor. Both sites have existing state-owned infrastructure in varying states of condition and utilisation. Buipe has historically served as a logistics node for petroleum products transported by barge from the south, while Mpakadan is the current terminus of the Tema-Mpakadan rail line connecting the Port of Tema to the shores of Lake Volta, emphasizing its potential as a multimodal gateway enabling the waterborne transport of transit containers and bulk fuel from Southern Ghana and beyond. Asikuma and Yapei are also potential secondary nodes of interest in the Eastern and Savannah Regions along Lake Volta.
GIIF and 24H+ recognise the strategic importance of inland water transport (IWT) to Ghana’s freight logistics, regional connectivity, and agricultural value chains, and as a critical enabler of the Volta Economic Corridor initiative championed by the 24-Hour Economy Authority. As part of GIIF’s mandate to facilitate infrastructure investment and its capacity as an infrastructure financing partner for the 24-Hour Economy and Accelerated Export Development Programme, GIIF and 24H+ intend to commission and undertake a pre-feasibility study to assess the technical, commercial, environmental, social, and financial viability of developing and operating an integrated North-South inland water transport corridor for the movement of transit containers and bulk fuel.
The study will provide the evidence base needed for GIIF and relevant government agencies to make informed investment decisions, structure appropriate financing arrangements, and engage development finance institutions and private-sector partners.
SERVICES REQUIRED
GIIF and 24H+ now seek to engage a suitably qualified and experienced consulting firm or consortium to conduct a Pre-feasibility Study for Inland Water Transport of transit containers and bulk fuel along the North-South corridor on the Volta Lake. The assignment is structured as a single Lot as indicated below.
Lot No.
Consultancy Assignment
Assignment Code
1
The rest of this notice is for subscribers
- The full notice as issued, about 1,130 words
- Email and SMS alerts for new tenders like this one
One payment covers twelve months and every tender on the site.