TENDERS.com.gh
8 May

Closed 8 May 2026 Expression of Interest

Design, Construction and Operation of a 200MW Grid-Scale Battery Energy Storage System (BESS)

Ministry of Energy and Green Transition Accra, Greater Accra Region

About this tender

MINISTRY OF ENERGY AND GREEN TRANSITION

REQUEST FOR DESIGN CONCEPT

ENGINEERING, PROCUREMENT, CONSTRUCTION, AND OPERATION OF 200 MW GRID-SCALE BATTERY ENERGY STORAGE SYSTEM (BESS)

Ghana's power system is operating with increasingly constrained capacity margins, limiting the system operator's ability to maintain adequate reserves, manage maintenance outages, and respond to demand fluctuations. Rising electricity demand, coupled with increasing forced outage rates from an ageing fleet of thermal generation plants, is further reducing available capacity and creating a projected supply deficit that could undermine system reliability.

The Government of Ghana, through the Ministry of Energy and Green Transition (MoEn&GT), invites qualified and experienced firms to submit concept designs for the development of a grid-scale Battery Energy Storage Systems (BESS) with a total capacity of 200 MNÍ21,500 MWh to address peaking capacity shortfalls.

The required BESS will be deployed as 10 lots of independent standardised modular units of 20 MW/ >= 150 MWh each to be operated under a unified dispatch and control framework. The modular configuration and structure will enable flexible deployment, ease of expansion, and efficient system integration, and allow for staged commissioning, with early delivery of initial lots to provide immediate system relief while enabling progressive expansion. Furthermore, in view of the limited space around some of the proposed substation locations, options and equipment arrangements that minimise the footprint of the installation will be viewed favorably.

The objective of this project is to...

The rest of this notice is for subscribers

  • The full notice as issued, about 420 words
  • Email and SMS alerts for new tenders like this one

One payment covers twelve months and every tender on the site.

Open in Energy, Power and Electrical

See all

More from Ministry of Energy and Green Transition

See all
Subscribe to read the full notice